Demonstrate the ability to draw up a detailed work activity plan for a corporate level project

Diploma in Project Management

Unit 3 Assignment 1 of 2:

Planning and Scheduling

Work Activity Planning and Costing

Assignment Aims

To learn how to draw up a Work Activity Plan (WBS/PBS)

for a major project

To learn how to draw up a Costs Breakdown for the Work Activity Plan

Assignment Outcomes

Demonstrate the ability to draw up a detailed Work Activity Plan for a corporate level project

Demonstrate the ability to prepare a detailed Cos

ts Breakdown for a Work Activity Plan

Assignment Task

Draw up a detailed Work Activity Plan for a corporate level project * to be agreed with your

Tutor

Using appropriate cost models, supported by discussions with the organisation’s finance

team, cost t

he plan

Present the Work Activity Plan and supporting Costs Breakdown to your Tutor

Assessment Criteria

You need to show that you have:

Analysed the work activities required for a corporate level project

Prepared a detailed Work Activity Plan, with

Outcomes, suitable for use by the project team

Prepared a detailed Costs Breakdown of the Work Activity Plan

Your Work Activity Plan and Costs Breakdown should be word processed and

or presented in

an appropriate format (such as Excel, Word, Access, Works)

The size of the documentation submitted for this assignment will depend on the nature of the

selected project

Please see Assignment Notes for advice on style and format

Planning and Scheduling

Project Planning and Management Guidance Notes

Assignment Aims

To learn how to draw up a detailed Project

Plan for a major project

To learn how to draw up supporting Management Guidance notes

Assignment Outcomes

Demonstrate the ability to draw up a detailed Project Plan for a corporate level project

Demonstrate the ability to prepare Management Guidance

notes for the Plan

Assignment Task

Select a major, corporate level, project to be agreed with your Tutor

Analyse information and data relating to the project, and

1. Prepare a Project Plan that incorporates:

•established scheduling techniques

• common activity planning methods common resource analysis and planning methods

2. Prepare Management Guidance notes on how the techniques and methods should be applied

Effectively

3. Prepare a detailed specific example of how to calculate a complex Network Node section

Assessment Criteria

You need to show that you have:

Researched the scheduling, activity planning, and resource analysis techniques and methods

required for the management of a major, corporate level project

Prepared a detailed Project Plan tha

t incorporates these techniques and methods

Prepared appropriate Management Guidance notes on how the techniques and methods

should be applied

Prepared a detailed specific example of how to calculate a complex Network Node section

The size of the document

ation submitted for this assignment will depend on the nature of the

selected project

Please see Assignment Notes for advice on style and format


Last Completed Projects

# topic title discipline academic level pages delivered
6
Writer's choice
Business
University
2
1 hour 32 min
7
Wise Approach to
Philosophy
College
2
2 hours 19 min
8
1980's and 1990
History
College
3
2 hours 20 min
9
pick the best topic
Finance
School
2
2 hours 27 min
10
finance for leisure
Finance
University
12
2 hours 36 min