Define a work breakdown structure and describe the methodology behind constructing one.

Assignment # 1:

Assignment 1: VoIP Part 1 (Work Breakdown Structure)

This assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.

Overview

As the project manager for an IT department, you have been assigned to manage the project of deploying a new VoIP phone system to the company’s campus. The campus consists of three (3) different buildings, each with twenty to fifty (20 to 50) workstations. The project must be completed in ninety (90) calendar days starting on November 1.

Deliverable 1: Summary (MS Word or open source equivalent)

  1.  Write a one to two (1-2) page summary document in which you:
  2. Summarize the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.).
  3. Define a work breakdown structure and describe the methodology behind constructing one.

Deliverable 2: WBS (MS Project or open source equivalent)

  1. Use Microsoft Project to create a WBS which:
  2. Contains at least five (5) main tasks, one for each of the PMBOK® process areas.
  3. Contains at least sixty (60) line items distributed in ten (10) or more work packages.
  4. Contains Work Breakdown Structure Code for each task.
  5. Presents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview.

Deliverable one (1) of your assignment must follow these formatting requirements:

  • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
  • Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Rubric:

 

Grading for this assignment will be based on answer quality, logic / organization of the paper, and language and writing skills, using the following rubric.

Points: 80 Assignment 3: VoIP Part 1 (Work Breakdown Structure)
Criteria Unacceptable

Below 70% F

Fair

70-79% C

Proficient

80-89% B

Exemplary

90-100% A

Deliverable 1: Summary (MS Word or open source equivalent)
1a. Summarize the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.).

Weight: 15%

Did not submit or incompletelysummarized the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.). Partiallysummarized the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.). Satisfactorilysummarized the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.). Thoroughlysummarized the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.).
1b. Define a work breakdown structure and describe the methodology behind constructing one.

Weight: 15%

Did not submit or incompletely defined a work breakdown structure and did not submit or incompletely described the methodology behind constructing one. Partially defined a work breakdown structure and partially described the methodology behind constructing one. Satisfactorily defined a work breakdown structure and satisfactorily described the methodology behind constructing one. Thoroughly defined a work breakdown structure and thoroughly described the methodology behind constructing one.
1c. Clarity, writing mechanics, and formatting requirements

Weight: 5%

More than 6 errors present 5-6 errors present 3-4 errors present 0-2 errors present
Deliverable 2: WBS (MS Project or open source equivalent)
2a. Create a WBS which contains at least five (5) main tasks, one for each of the PMBOK® process areas.

Weight: 20%

Did not submit or incompletely created a WBS whichcontains at least five (5) main tasks, one for each of the PMBOK® process areas. Partially created a WBS which contains at least five (5) main tasks, one for each of the PMBOK®process areas. Satisfactorily created a WBS whichcontains at least five (5) main tasks, one for each of the PMBOK® process areas. Thoroughly created a WBS whichcontains at least five (5) main tasks, one for each of the PMBOK® process areas.
2b. Create a WBS which contains at least sixty (60) line items distributed in ten (10) or more work packages.

Weight: 20%

Did not submit or incompletely created a WBS which contains at least sixty (60) line items distributed in ten (10) or more work packages. Partially created a WBS which contains at least sixty (60) line items distributed in ten (10) or more work packages. Satisfactorily created a WBS which contains at least sixty (60) line items distributed in ten (10) or more work packages. Thoroughly created a WBS which contains at least sixty (60) line items distributed in ten (10) or more work packages.
2c. Create a WBS which contains Work Breakdown Structure Code for each task.

Weight: 5%

Did not submit or incompletely created a WBS which contains Work Breakdown Structure Code for each task. Partially created a WBS which contains Work Breakdown Structure Code for each task. Satisfactorily created a WBS which contains Work Breakdown Structure Code for each task. Thoroughly created a WBS which contains Work Breakdown Structure Code for each task.
2d. Create a WBS which presents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview.

Weight: 20%

Did not submit or incompletely created a WBS whichpresents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview. Partially created a WBS whichpresents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview. Satisfactorily created a WBS whichpresents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview. Thoroughly created a WBS whichpresents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Assignment #2:

 

Assignment 2: VoIP Part 2 (Gantt and PERT Charts)

Update the Microsoft Project file you created in Assignment 3: VoIP Part 2 (Work Breakdown Structure) with the following changes:

  • Set property values to denote progress in at least fifteen (15) of the line items.
  • Set properties so that at least one (1) of the main tasks is behind schedule.
  • Create a Gantt chart for your project.
  • Take a screenshot of the Gantt chart which can later be inserted into your written paper.
  • Create a PERT diagram that identifies the critical path.
  • Take a screenshot of the PERT chart which can later be inserted into your written paper.

Note: If you need a tutorial on taking a screen shot, visit one of the following locations: (PC users: http://www.take-a-screenshot.org/) (MAC users: http://binged.it/1xriOcN).

Write a two to three (2-3) page paper in which you:

  1. Compare and contrast the information that one receives from a Gantt chart, versus that of a PERT diagram.
  2. Examine the advantages of using a Gantt chart over a PERT chart and vice versa. Determine when it is appropriate to use one over the other. Justify your response.
  3. Assess the importance of the critical path in project management.
  4. Insert the screenshots of the Gantt and PERT charts you created based on the provided criteria. Elaborate on the status of the VoIP deployment project based on the updated information. Note: The graphical representations do not count toward the overall page requirement.
  5. Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Your assignment must follow these formatting requirements:

  • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
  • Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.
  • Import completed diagrams, charts, or screenshots into the Word document before the paper is submitted.

 

Rubric:

Grading for this assignment will be based on answer quality, logic / organization of the paper, and language and writing skills, using the following rubric.

Points: 80 Assignment 4: VoIP Part 2 (Gantt and PERT Charts)
Criteria Unacceptable

Below 70% F

Fair

70-79% C

Proficient

80-89% B

Exemplary

90-100% A

1. Compare and contrast the information that one receives from a Gantt chart, versus that of a PERT diagram.

Weight: 20%

Did not submit or incompletely compared and contrasted the information that one receives from a Gantt chart, versus that of a PERT diagram. Partially compared and contrasted the information that one receives from a Gantt chart, versus that of a PERT diagram. Satisfactorily compared and contrasted the information that one receives from a Gantt chart, versus that of a PERT diagram. Thoroughly compared and contrasted the information that one receives from a Gantt chart, versus that of a PERT diagram.
2. Examine the advantages of using a Gantt chart over a PERT chart and vice versa. Determine when it is appropriate to use one over the other. Justify your response.

Weight: 20%

Did not submit or incompletelyexamined the advantages of using a Gantt chart over a PERT chart and vice versa. Did not submit or incompletelydetermined when it is appropriate to use one over the other. Did not submit or incompletely justified your response. Partially examined the advantages of using a Gantt chart over a PERT chart and vice versa. Partially determined when it is appropriate to use one over the other. Partially justified your response. Satisfactorily examined the advantages of using a Gantt chart over a PERT chart and vice versa. Satisfactorily determined when it is appropriate to use one over the other. Satisfactorily justified your response. Thoroughly examined the advantages of using a Gantt chart over a PERT chart and vice versa. Thoroughly determined when it is appropriate to use one over the other. Thoroughly justified your response.
3. Assess the importance of the critical path in project management.

Weight: 20%

Did not submit or incompletely assessed the importance of the critical path in project management. Partially assessed the importance of the critical path in project management. Satisfactorily assessed the importance of the critical path in project management. Thoroughly assessed the importance of the critical path in project management.
4. Insert the screenshots of the Gantt and PERT charts you created based on the provided criteria. Elaborate on the status of the VoIP deployment project based on the updated information.

Weight: 25%

Did not submit or incompletely inserted the screenshots of the Gantt and PERT charts you created based on the provided criteria. Did not submit or incompletelyelaborated on the status of the VoIP deployment project based on the updated information. Partially inserted the screenshots of the Gantt and PERT charts you created based on the provided criteria. Partially elaborated on the status of the VoIP deployment project based on the updated information. Satisfactorily inserted the screenshots of the Gantt and PERT charts you created based on the provided criteria. Satisfactorily elaborated on the status of the VoIP deployment project based on the updated information. Thoroughly inserted the screenshots of the Gantt and PERT charts you created based on the provided criteria. Thoroughly elaborated on the status of the VoIP deployment project based on the updated information.
5. 2 references

Weight: 5%

No references provided Does not meet the required number of references; some or all references poor quality choices. Meets number of required references; all references high quality choices. Exceeds number of required references; all references high quality choices.
6. Clarity, writing mechanics, and formatting requirements

Weight: 10%

More than 6 errors present 5-6 errors present 3-4 errors present 0-2 errors pres

Last Completed Projects

# topic title discipline academic level pages delivered
6
Writer's choice
Business
University
2
1 hour 32 min
7
Wise Approach to
Philosophy
College
2
2 hours 19 min
8
1980's and 1990
History
College
3
2 hours 20 min
9
pick the best topic
Finance
School
2
2 hours 27 min
10
finance for leisure
Finance
University
12
2 hours 36 min